- Make:- Knorr Bremse
- Failures:- Oil Leakage and Coupler Slack.
- Failure Mode:- Metal Bellow glued to motor side hub got disengaged. another reason cited by Knorr Bremse was milky oil due to low duty cycle.
- Oil change recommended after 20-30 hrs of commissioning.
Friday, November 9, 2012
Main Compressor
Pantograph
Shunk
Stone India
- Obliqueness on welded cover on air bellows results in failure.
- Flexible shunt burning cases have been observed.
- Weight:-
Stone India
Transformer
Some modifications done:-
- Insertion resistance.
- Oil level sensor.
- Temperature sensor PT100.
- HT Bushing Plate
- Blower
Central Pivot
Material:- MAFR, Single forged shaft.
Reduction in Forging:- 3:1 in normalised condition.
Mechanical Properties :- T/S 490 Mpa, Y/S 270 MPa, 21% Elongation, Hardness 140 MIN BHN.
Microstructure , and Magnetic Particle Test is also specified from NABL accredited Govt Appd. Lab.
Reduction in Forging:- 3:1 in normalised condition.
Mechanical Properties :- T/S 490 Mpa, Y/S 270 MPa, 21% Elongation, Hardness 140 MIN BHN.
Microstructure , and Magnetic Particle Test is also specified from NABL accredited Govt Appd. Lab.
Wednesday, June 29, 2011
Traction Motor
Monday, June 27, 2011
Earth Return Brush
Tuesday, June 21, 2011
Monday, June 20, 2011
MRVC Rake HTC
- Two Handicap Trailer coaches are there in 12 car MRVC rake.
- Compartaments are HC-SL-V.
- HC - 19 seats, SL ( second class ladies )- 74 seats, V- 6 seats + 1.33 T luggage.
- Tare weight:- 37 T, total payload:- 33 T.
- Compressor with air dryer and Battery Box mounted in underframe.
- Grab poles, protective screen etc are of SS.
- Flooring is of SS with moonrock finish.
- Roof and ducts are SS Micromat finish.
- Seats and Backrest- polycarbonate.
Wednesday, June 15, 2011
Retrofitment Cost
C Jumpers
19 pins of C jumper transfer important functions like:-
Reverse , Forward, Half Power , full Power, continuity, DC negative, 50% light, Light On/OFF, Fan OFF/ON, Alarm Bell, Overload Indiacation, and ABB open Indication and some are spare also.
Reverse , Forward, Half Power , full Power, continuity, DC negative, 50% light, Light On/OFF, Fan OFF/ON, Alarm Bell, Overload Indiacation, and ABB open Indication and some are spare also.
Single Pole VCB
- Min presuure;- 3.3 kg/sqcm
- Max pressure:- 3.6 kg/sqcm
- Max time between Successive closing operations:- 30 sec
- Cost :- Rs. 2.4 lakhs
Tuesday, June 14, 2011
Auxiliary Compressor
- Rated Pressure:- 8.0 Kg/sqcm
- Cylinder Size and Stroke:- 60 x 35
- Displacement:- 150 lpm
- Motor:- 1 HP , 110 V Dc/ 8.5 A
- FAD:- 6 cubic m/ hr
- Speed :- 1500 rpm
- Cost :- Rs 20,000
Monday, June 13, 2011
Bulk RSP
- PB 2011-12 Item # 1107 :- 96.10 Crore Detailed Estimate under vetting for BHEL electric conversion @ 4.5 Cr/rake for 20 rakes.
- PB 2011-12 item # 1110 :- Siemens spares :- Distribution between WR and CR awaited.
Tuesday, June 7, 2011
Auxiliary Motors
- Oil Pump:- 1.5 HP , 240 V , AC, 6.5 A, 400 LPM, 40 Mf. ( Manju )
- Rectifier Fan Motor:- 1 HP, 240 V, Ac, 4.5 A, 40 Mf, ( SHI )
- Radiator fan motor:- 0.5 Hp, 240 V AC, 4.5 A, 20 Mf. ( GEC, Manju, SHI )
- Aux Compressor Motor:- 1 HP , 110 V DC, 8.5 A ( Elgi, CEC)
- Main Compressor Motor:-12.5 HP, 110 V DC, 100 A. ( Kirloskar, ELGI )
Monday, June 6, 2011
Sunday, June 5, 2011
Stainless Steel Air Reservoir
- Capacity :- 125 ltrs
- Dia :- 430 mm, Length :- 1060 mm
- Now ICF is sending with 1 Air reservoir in MC.
- These are provided in DTC and TC also.
Saturday, June 4, 2011
About the EMU fan...
- Sweep :- 450 mm
- Voltage :- 110V DC/AC ( optg range 90-140 V ), 140 V AC ( optg Range 90-170 V).
- Blade :- FRP ( 30 % glass filled)
- Wattage :- DC Fan 35 W, AC Fan 65 W.
- Min Air delivery :- 75-85 cubic mtrs / min
- Noise level :- 60 dB
- Weight :- 8 Kg
- Bearing:- SKF
Subscribe to: